top of page

Building Services ARC 2423

 

Project 1 - Application of building services 30%

 

On completion of this assignment, students will be able to:

1. Propose a complete installation of appropriate building services systems for the students’ own design; cold 

and hot water supply, sewerage, sanitary and drainage systems as well as electricity supply.

2. Familiarize with the images of different components for each building services system proposed.

3. Produce drawings and diagrams of building services systems which relate to the design.

The objectives of this assignment are as follows:

1. To introduce students to the basic principles, process and equipment of various building services systems through real life project (experiential learning).

2. To expose students to the integration of various building services systems in a building.

3. To allow students to demonstrate their nderstanding of building services systems

4. To develop students’ understanding and familiarity on the drawing conventions and standards for different building services systems

 

Project 2 - Case Study, Analysis and Documentation of Building Services Systems

40% of the total assessment (30% group work & 10% individual)

 

On completion of this assignment, students will be able to:

1. Identify and understand relevant information related to water and electrical supply, sewerage, mechanical

ventilation and air-conditioning as well as fire protection systems.

2. Understand how each building services functions including the connections and position of different parts 

equipment.

3. Understand and explain the principles and systems as well as space implications and regulations related to 

different building services

  • w-facebook
  • Twitter Clean
  • w-flickr
bottom of page